• CONTACT
  • |
  • Français

Logo Bronswerk :: Onboard climate engineering

Renowned engineering excellence
Marine HVAC-R Military HVAC-R OFFSHORE HVAC-R Industrial Products Corporate Contact
Knowledge for optimal efficiency MARINE HVAC-R APPLICATIONS
MARINE HVAC-R CASE STUDIES

Newly Awarded

Todd Logo

Washington State Ferry – II
Bronswerk Group is supplying and installing HVAC and and engine room ventilation for a 164 foot car ferry.

Builder
Todd Shipyard in Seattle Washington

End-client
State of Washington Government

 

To be delivered 2010 to 2013

Todd Logo

Ferry – Chetzemoka
Bronswerk Group contracted to design, supply and install HVAC system for a 164 foot car ferry.

Builder
Todd Shipyard in Seattle Washington

End-client
State of Washington Government


Todd Logo

Ro-Ro Passenger Ferry –I & II (2010 & 2011)
Bronswerk Group contracted to design and supply HVAC systems for two 42-meter car ferries.

Builder
Peter Kiewit Sons Co. (Canada)

End-client
Government of Newfoundland & Labrador

 

Delivered 2005 - 2009

Todd Logo

SeaBus – MV Burrard Pacific Breeze  (2009)
Bronswerk Group contracted to design and supply the HVAC system for a 400 passenger catamaran ferry.

Builder
Victoria Shipyard in British Columbia

End-client
Translink


Todd Logo

Tugboat – Laurie Ann Reinauer (2009)
Bronswerk Group contracted to design, supply and install complete HVAC & Engine Room ventilation for the ATB

Builder
Senesco Marine

End-client
Reinauer Transportation


Todd Logo

Tugboat –Ruth M.  Reinauer (2008)
Bronswerk Group contracted to design, supply and install complete HVAC & Engine Room ventilation for the ATB

Builder
East Isle Shipyard  Canada

End-client
Reinauer Transportation


Todd Logo

Woods Hole Ferry – Island Home (2008)
Bronswerk Group contracted to design, supply and install complete HVAC system including technical spaces, cargo and engine room ventilation for a 1200 passenger, 255-foot car ferry.

Builder
VT Halter Shipyard

End-client
Steamship Authority for the State of Massachusetts


Todd Logo

Container Vessel - National Glory (2007)
Bronswerk Group contracted to design and supply the complete HVAC & Refrigeration systems for the container Vessel

Builder
Chengxi Shipyard Co. (China)

End-client
Gulf Pacific Lines


Todd Logo

2 Tugboats – Raymond Lemay& Henry Bain (2007)
Bronswerk Group contracted to design, supply and install complete HVAC & Engine Room ventilation for the tugboat

Builder
East Isle Shipyard in PEI

End-client
Groupe Ocean Inc.


Todd Logo

Hopper Dredge – (2006)
Bronswerk Group contracted to design, supply and install HVAC, ER ventilation and domestic refrigeration systems for a 390ft hopper dredge.

Builder
Alabama Shipyard Inc.

End-client
Manson Construction Co.


Todd Logo

High Speed Car Ferry – Chenega (2005)
Bronswerk Group contracted to complete HVAC system including technical spaces, cargo and engine room ventilation for a 250 passenger high speed ferry.

Builder
Derecktor Shipyards

End-client
Alaska Marine Highway


Todd Logo

Tugboat - Cedar (2005)
Bronswerk Group contracted to design, supply and install complete HVAC & Engine Room ventilation for the tugboat

Builder
East Isle Shipyard in PEI

End-client
Atlantic Towing


Todd Logo

Tugboat – Stevns Iceflower (2005)
Bronswerk Group contracted to design, supply and install complete HVAC & Engine Room ventilation for the tugboat

Builder
East Isle Shipyard in PEI

End-client
Stevns Sg A/S

 

Delivered 2000-2004

Todd Logo

Ro-Ro Ferry – MV Jean Anne (2004)
Bronswerk Group contracted to design, supply and install HVAC for the first pure car and truck Roll-on/Roll-off carrier of its kind in the US.  A 579-foot; 13,000-ton vessel carries up to 4,300 American sized cars. Named 2006 Ship of the Year by the Professional Mariner Magazine.

Builder
VT Halter Shipyard

End-client
Pasha Hawaii Transport Lines


Todd Logo

2 Tugboat – Caucedo & Malena (2004)
Bronswerk Group contracted to design, supply and install complete HVAC & Engine Room ventilation for the tugboat

Builder
East Isle Shipyard in PEI

End-client
Caucedo Marine Services


Todd Logo

Container Vessel – MVMaunawili & MV Manukai (2003-2004)
Bronswerk Group contracted to design and supply complete HVAC system as well as the ventilation for the Technical Spaces, Engine Room and the Cargo Hold for two container Vessels Shipyard

Builder
Kvaerner Philadelphia Shipbuilding Inc.

End-client
Matson


Todd Logo

Paddlewheel Cruise Boat – Empress of the North (2003)
Bronswerk Group contracted to design, supply and install HVAC system for a 223-passenger cruise ship

Builder
Nichols Bros Boat (USA)

End-client
American West Steamboat Co.


Todd Logo

Two Tugboats - Atlantic Oak I and II (2003 - 2004)

Bronswerk Group contracted to design, supply and install complete HVAC & Engine Room ventilation for the tugboat

Builder
East Isle Shipyard in PEI

End-client
Atlantic Towing


Todd Logo

High Speed Ferries – Fairweather (2004)
Bronswerk Group contracted to design, supply and install HVAC system for a 250 passenger, 36 car high speed ferry.

Builder
Direcktor Shipyard

End-client
Alaska Marine Highway


Todd Logo

3 Tugs – Colon, Cocle, Los Santos
Bronswerk Group contracted to design, supply and install complete HVAC & Engine Room ventilation for three tugboats

Builder
East isle Shipyard

End-client
Panama Canal Authority (2001)(2002)


Ro-Ro Passenger Ferry – Hamnavoe (2003)
Bronswerk Group contracted to design and supply complete HVAC system and chilled water Units for these two 360-foot, 600 passenger ferries.

Builder
Aker Finnyards (Finland)

End-client
Northlink (UK)


Todd Logo

Ro-Ro Passenger Ferries – Hjaltland & Hrossey (2002)
Bronswerk Group contracted to design and supply complete HVAC system and chilled water Units for these two 395-foot, 600 passenger ferries.

Builder
Aker Finnyards (Finland)

End-client
Northlink (UK)


Todd Logo

Passenger Cruise Ferry – Romantica (2002)
Bronswerk Group contracted to design and supply complete HVAC system and chilled water Units for this ship that was designed for 2500 passengers, almost 700 cabins.

The Romantica has dance and dining restaurants, bars and shops as well as a playroom for children, sauna department and conference department

Builder
Aker Finnyards (Finland)

End-client
Tallink

  • MARINE HVAC-R Design Roadmap
  • |
  • MARINE HVAC-R Systems
  • |
  • MARINE HVAC-R Knowledge for Optimal Efficiency

Copyright © Bronswerk Marine 2010. All rights reserved. Bronswerk. Onboard Climate Engineering is a registered Trademark of Bronswerk Marine Inc.

  • Home
  • |
  • Marine HVAC-R
  • |
  • Military HVAC-R
  • |
  • Offshore HVAC-R
  • |
  • Industrial Products
  • |
  • About us
  • |
  • Corporate Profile
  • |
  • Careers
  • |
  • |
  • References

  • Certifications
  • |
  • Alliances
  • |
  • Brochures
  • |
  • Newsletter
  • |
  • Contact
  • |
  • Site Map
  • |
  • Design by eau³