To be delivered 2014 - 2015

Wind-Farm Transport and Installation Vessels (2014)
Design, supply and install complete HVAC systems as well as design, manufacture and install two custom Chillers (135 ton) and one custom Reefer/Unit Cooler (2.2 ton).
Builder
J.J.SIETAS KG / Van Oord, Gmbh
End-client
Van Oord, Gmbh

FPSO Vessel Floating Production Storage and Offloading (2014)
Bronswerk Group contracted to design and manufacture custom Explosion-Proof Air-Cooled Condensing Units for the Emergency Switch Room & the Aft Muster Room.
Builder
Suncor Energy Inc., St-John’s, NL
End-client
Suncor Energy Terra Nova
Delivered 2010 - 2013

FPSO Vessel Floating Production Storage and Offloading (2012)
Bronswerk contracted to design and manufacture a custom 30-ton replacement chiller.
Builder
Suncor Energy Inc., St-John’s, NL
End-client
Suncor Energy Terra Nova

FPSO Vessel Floating Production Storage and Offloading (2013)
Bronswerk Group contracted to design and manufacture custom 30-ton replacement chillers and a Master Control Panel.
Builder
Wood Group PSN (Production Services Network Canada Inc.), St-John’s, NL
End-client
Suncor Energy Terra Nova

Wind-Farm Transport and Installation Vessel (2013)
Bronswerk Group contracted to design, supply and install complete HVAC systems a well as design, manufacture and install two (2) 475 kW (135 Ton) Chillers and one (1) 7.7 kW (2.2 Ton) Reefer/Unit Cooler for the Provision Room.
Builder
J.J.SIETAS KG
End-client
Van Hoord, Netherlands
Delivered 2005 - 2009

Semi-Submersible Accommodation / Maintenance Vessel – PSS Chemul (2005)
Bronswerk Group contracted to design, supply and install HVAC upgrade for the 13,000 ton semi-submersible accommodation/ maintenance vessel.
Builder
Bender Shipbuilding
End-client
Pemex (Mexico)

Crude Oil Tanker 46,500 DWT (2009)
Bronswerk Offshore was contracted to design and supply the complete HVAC and domestic refrigeration system for the Crude Oil Tanker.
Builder
Jiangdu Shipyard (China)
End-client
China Shipping
Delivered 2000 - 2004

FPSO Self propelled Platform – Terra Nova (2000)
Bronswerk Offshore was contracted to design and supply the complete HVAC system, domestic Refrigeration and Mechanical Ventilation including all fire safety equipment for this FPSO. The Terra Nova is 292m long with a breadth of 45m, and as tall as an 18-storey building. It is designed with a production capacity of up to 150,000 barrels of oil per day, and a storage capacity of 960,000 barrels.( 2000)
Builder
Daewoo Heavy Industries (Korea)
End-client
Terra Nova Alliance

Semi-Submersible Platforms –Amethyst I, II (2003)
Bronswerk Group contracted to design and supply HVAC and Chilled Water systems as well as Domestic Refrigeration and Mechanical ventilation for two (or 3???) 12,000 ton offshore semi-submersible oil drilling vessels.
Builder
Cianbro (USA)
End-client
Petrodrill